GU-750 – HSE Precautions for NORM Well Re-Entry – PDO

Last Updated: July 26th, 2022/Views: 605/

ID:

184

Version:

2

File Type:

PDF

Size:

0.2 Mb

Organization:

PDO

Published:

2015

Country:

Oman

Type:

Guideline

Pages:

8 pages

Language:

English [EN]

To provide safe systems of work when handling equipment and fluids potentially contaminated with NORM during well re-entry operations with work-over or drilling rigs.

This procedure shall apply to all well re-entry operations carried out by drilling or work-over rigs. All wells, which have been previously active (not new wells), shall be considered NORM contaminated unless demonstrated otherwise by measurements using the correct meters. A separate procedure exists for the wireline and coil tubing unit operations of production wells.

Leave A Comment

Related Downloads