PR-2175 – Part 2 – In-Sourcing Organizational Procedure
ID:
345
Version:
1
File Type:
Size:
1.3 Mb
Organization:
PDO
Published:
2019
Country:
Oman
Type:
Procedure
Pages:
88 pages
Language:
English [EN]
Login|Register to activate the download link.
The objective of this manual is to ensure that procedures detailing Nimr In-Sourcing Project’s generic requirements are available to the staff involved with the operations of the drilling and workover units.
This manual is applicable to the operations carried out in the standard operating modes under normal operating conditions.
This manual will serve as a reference for staff coastal involved with the planning, conduct, and verification of the field operation.