PR-2175 – Part 2 – In-Sourcing Organizational Procedure

Last Updated: November 11th, 2022/Views: 2409/

ID:

345

Version:

1

File Type:

PDF

Size:

1.3 Mb

Organization:

PDO

Published:

2019

Country:

Oman

Type:

Procedure

Pages:

88 pages

Language:

English [EN]

The objective of this manual is to ensure that procedures detailing Nimr In-Sourcing Project’s generic requirements are available to the staff involved with the operations of the drilling and workover units.
This manual is applicable to the operations carried out in the standard operating modes under normal operating conditions.
This manual will serve as a reference for staff coastal involved with the planning, conduct, and verification of the field operation.

Leave A Comment

Related Downloads