1. Sources of Information Used in Identifying Hazards and Assessing Risk

  • Accident/Incident and Ill-Health Data and Rates
    • incidence rate,
    • frequency rate,
    • severity rate and
    • prevalence rate.
  • Internal & External Information Sources

Sources-For-Hazard-Identification-Risk-Assessment

  • Uses and Limitations of Information Sources
    • Internal
      • Incidence are rear events
    • External
      • Different industries
      • different multiplier
      • different terms of reference (definitions)
      • Overtime or part-time workers are not taken into account
      • The figures may be for workers only
      • Culture differences
      • Different risk levels
      • different risk management arrangements

2. Hazard Identification Techniques

  • Hazard Detection Techniques
    • task analysis,
    • checklists – covers the key issues to be monitored is developed to ensure a consistent and comprehensive approach to checking all the safety elements to be covered during an inspection.
    • observations and
    • incident reports.
  • Importance of Worker Input

3. Assessment and Evaluation of Risk

  • Key Steps in a Risk Assessment
    • Hazard identification.
    • Identify who is at risk.
    • Estimation, evaluation of risk and identifying precautions.
    • Record significant findings and implement.
    • Review the assessment.
  • Use and Limitation of Generic, Specific and Dynamic Risk Assessments
  • Limitations of Risk Assessment Processes
  • Temporary and Non-Routine Situations
  • Consideration of Long-Term Hazards to Health
  • Types of Risk Assessment
    • Generic – apply to commonly identified hazards and set out the associated control measures and precautions.
    • Specific – apply to a particular work activity and the persons associated with it.
    • Dynamic – apply to work activities that involve changing environments and require quick mental assessments to manage risks.
    • Qualitative – risks are represented by simple word descriptors.
      • – Risk = Probability (or Frequency) × Consequence (or Harm or Severity).
      • – Probability is the chance that a given event will take place.
      • – Severity of risk is the outcome.
    • Semi-quantitative – results represented by qualitative and quantitative descriptions. In some the risk is expressed as a number which indicates rank and not an absolute value.
    • Quantitative – risks are represented by the frequency or probability of a specified level of harm, from a specified activity.
  • Organizational Arrangements for an Effective Risk Assessment Programme
    • Plan – what you want to achieve, who will be responsible for what, how you will achieve your aims, and how you will measure your success.
    • Do – identify your risk profile, organise your activities to deliver your plan.
    • Check – measure your performance, assess how well the risks are being controlled and investigate the causes of  accidents, incidents or near misses.
    • Act – review your performance and take action on lessons learned, including from audit and inspection reports. Once hazards have been identified, the risk they pose needs to be assessed and prioritised.
  • Acceptability/Tolerability of Risk

4. Systems Failures and System Reliability

  • Meaning of the Term ‘System’
    • complicated interactions between processes and that failure of the system may need detailed investigation to discover the causes by adopting both holistic and reductionist approaches.
  • Principles of System Failure Analysis
  • Using Calculations in the Assessment of System Reliability
    • parallel,
      • Formula: RS= 1 – [(1 – RA)(1 – RB)]
    • series,
      • Formula: RS = RA × RB
    • mixed systems
      • Formula: Calculate all Parellel Systems, then treat system as a chain of Series Systems.
  • Methods for Improving System Reliability, by using
    • reliable components,
    • quality assurance,
    • parallel redundancy,
    • standby systems,
    • minimizing failures to danger,
    • planned preventive maintenance and
    • minimizing human error
      • The ‘right’ person is doing the ‘right’ job.
      • The individual has adequate training and instruction.
      • The individual receives appropriate rest breaks.
      • The man-machine interface is ergonomically suitable.
      • The working environment is comfortable, e.g. noise, lighting, heating, etc.

5. Failure Tracing Methodologies

  • A Guide to Basic Probability
    • Probability is the chance something will happen.
    • Frequency takes account of the exposure.
    • To calculate the probability of two or more independent events occurring, we Multiply the probabilities.
    • To calculate probability of one event OR another, we Add the probabilities of the two separate events.
    • To calculate the probability of a probable event happening at certain frequency to cause harm we Multiply Probability by Frequency.
  • Principles and Techniques of Failure Tracing Methods in the Assessment of Risk
    • HAZOP
      • Keywords:
        • NO or NOT – Negation of intention, e.g. no flow.
        • MORE – Quantitative increase, e.g. high pressure.
        • LESS – Quantitative decrease, e.g. low temperature.
        • AS WELL AS – Qualitative increase, e.g. impurity present.
        • PART OF – Qualitative decrease, e.g. only one of two components present.
        • REVERSE – Logical opposite of intention, e.g. backflow.
        • OTHER THAN – Complete substitution, e.g. flow of wrong material.
    • Fault Tree Analysis
      • Keywords:
        • Event. To Understand: Divide 1 to contributing factors’ probability calculation result.
        • AND Gate – all events need to be present at the same time to allow the Top Event. – Most Efficient. To Calculate: Multiply Probabilities
        • OR Gate – one of the events need to be present at the same time to allow the Top Event. To Calculate: Add  Probabilities.
        • Basic Fault
    • Event Tree Analysis

Appendix 1. Support Links