Search or navigate to a page

Route Survey
Road surface condition satisfactory
No steep gradients which may cause problem
Road width & tight corners OK for load
Height of overhead power lines sufficient
No road-side obstructions, e.g. poles, signs, rocks, etc.
No road or maintenance works ongoing
Equipment
Equipment general condition
Tyres / lights
Load is secure
Emergency equipment available, e.g. reflective triangles
Location
Correct location
Clean and free from oil/ construction waste
Location is levelled and compacted
Earth pit available and reading OK
Cellar condition / clean
Sewage pit available and emptied
Operational
Nil
Sign in to join the conversation