F-42 – Fire Warden Checklist

Last Updated: January 8th, 2023/Views: 941/0.9 min read/
Online FREE HSE Software
Process
  • Toolbox Talk held and full understanding of (a) Communication means, (b) Break-off signal and action in event of an Alarm, (c) Work process
People
  • Fire Watchman knows how to use fire extinguisher
  • Number of Firewatchers considered
  • Fire Watchman is in direct contact with person conducting work
Area
  • Heat/Smoke sensors have been inhibited
  • Isolations Applied
  • Pressurized systems are bled off
  • Escape routes are clear
  • Area within 7 meters from worksite – on same level – been inspected and have flammable and combustible material been removed or isolated from ignition sources (such as ropes, hoses, pools of oil, gas bottles)
  • Areas exposed to heat transfer in adjacent compartments (above, under, next to) been inspected, and
  • Flammable and combustible material been removed or isolated from ignition sources
  • Areas be monitored during work
Equipment
  • Fire extinguisher readily available
  • It is the correct type for the type of work concerned e.g. CO2 for electric, powder for oil, water for wood and cardboard
  • Fire extinguisher is charged
  • Backup Fire extinguisher is available
  • If a fire blanket is required, is it in good condition with no holes or oil contamination

Leave A Comment