F-68b – Land Rig Pre-move Checklist

Last Updated: March 25th, 2022/Views: 515/0.5 min read/
Online HSE Software

Route Survey

  • Road surface condition satisfactory
  • No steep gradients which may cause problem
  • Road width & tight corners OK for load
  • Height of overhead power lines sufficient
  • No road-side obstructions, e.g. poles, signs, rocks, etc.
  • No road or maintenance works ongoing

Equipment

  • Equipment general condition
  • Tyres / lights
  • Load is secure
  • Emergency equipment available, e.g. reflective triangles

Location

  • Correct location
  • Clean and free from oil/ construction waste
  • Location is levelled and compacted
  • Earth pit available and reading OK
  • Cellar condition / clean
  • Sewage pit available and emptied

Operational

  • Nil