PDO Well Engineering 5 Must wins
Petroleum Development of Oman, Well Engineering directorate came up with an amazing idea to focus on the most painful HSE aspects of the operations that continuously cause incidents.
As a result of the analysis of the root causes, the team identified the countermeasures in each of 5 pain areas to prevent those surging incidents from happening.
Road Safety
Hand Safety
The Four Golden Questions