Search or navigate to a page
Woodside Energy are seeking an offshore Senior Health and Safety adviser for a 9-month contract with potential to extend.
Scarborough Floating Production Unit (FPU) is currently in execute phase (construction and commissioning) with an expected start up in 2H 2025. The FPU is the offshore gas processing facility of the greater Scarborough development. In normal operations, the FPU will be minimally attended, remotely controlled from Perth, with campaigns to execute maintenance. FPU provides gas processing, which includes gas separation, dehydration and compression, before transporting dry gas to shore for LNG processing.
The SCA FPU asset will be leaving China in October at the Sailaway milestone. During Nov/Dec the FPU will be moved (sailed) to the new location in Australian waters off the coast of Exmouth. Once on station in Australia, the project will commence the Hookup and Commissioning (HUC) phase (mid December).
Woodside’s Scarborough HSE team is seeking an Offshore Senior Health & Safety Advisor. Initial placement would be in the Perth Mia Yellagonga office from November for 1-2 months, transitioning to a 3/3 FIFO roster from Perth. The contract is offered on a 9-month duration with the possibility of going longer.
Sign in to join the conversation