How much time do EHS professionals spend researching on hearing protection?
1 Answer
0
July 24, 2020 5:46 pm
Topic starter
This will depend on the requirement of the particular plant, risk level.
Not much required to be done if the below conditions are met:
- Noise survey was part of pre-commissioning;
- If the existing hearing Protection is adequate to the noise level expected in the working environment
- As long as new plants with different noise level are not introduced to the working environment